Drastically reduce wiring time through a seamless flow of data from 3D design to the completed control panel
Electrical control manufacturers continue to be placed under considerable pressure. Projects are becoming much more complex, the trading environment is extremely competitive, and customers will naturally want to keep their costs to a minimum.
With a typical specification having more than 300 pages and taking approximately 54 hours to read (source: Stuttgart University), the challenges start right from the moment estimating engineers receive details of a new project and continue through design, panel manufacturing and wiring.
In this whitepaper we address the current challenges facing electrical control manufacturers, paying particular interest to the most time-consuming phase - wiring. With seamless data flow at the heart, the strong partnership of EPLAN and Rittal, illustrates how this phase can be drastically reduced with the help of automation.
For access to the interactive whitepaper please complete the form and a link will be sent to your email.